Viega’s Megapress provides ideal solution…

Viega’s Megapress connection technology has been specified as the ideal solution for a section of pipe relocation work at The National Gallery in London. The industry-first press connection system for thick-walled steel tube, Megapress, ensured that the installation of steel pipework for the building’s heating and chilled water HVAC systems could take place without disruption to the gallery space which remained open throughout the project.

The work was necessary in preparation for a gallery extension which is due to take place in January 2019. Before the building work could take place, it was vital that all pipe routes were relocated, bypassing the location of the extension, so that the other gallery spaces could continue to remain open during the planned building work.